
New construction of care centre in Upplands Väsby. The building comprises some 5,500 m² and will contain 76 flats distributed over 4-5 floors. Construction is scheduled for completion in August 2015. The frame construction consists of steel and joists of HD/f. The projection is conducted in 3D using Tekla Structures.
Our assignment: BTB was assigned for production of construction documents for the prefab frame including manufacturing drawings for steel and concrete elements.